Exploration Project News - 2010
2010
December 15, 2010: $1,150,000 Private Placement Closes
December 8, 2010: Donner Appoints Vice President of Engineering
November 29, 2010: Donner and Xstrata Receive Development of the Year Award
29 novembre, 2010: Donner et Xstrata Récipiendaires du Prix du Développement de l'Année
November 15, 2010: 2.35% Copper Over 8.9 Metres Intersected in the North Flank of the Matagami Camp
October 22, 2010: Amendment to Warrant Terms
October 4, 2010: Xstrata Zinc to Conduct Definition Drilling at PD1 Deposit
4 octobre, 2010: Xstrata Zinc Effectuera un Forage de Delimination Au Gite PD1
September 2, 2010: Donner Metals Receives A Positive Feasibility Study For The Bracemac-McLeod Deposit in the Matagami Base Metal Camp in Central Québec
July 12, 2010: Drilling Extends High-Grade Sulphides at McLeod Deep
12 juillet 2010: La Campagne de Forage Accroit L’Étendue de la Zone de Sulfures À Forte Teneur de McLeod Deep
July 9, 2010: Xstrata Zinc Announces Construction on the Bracemac-McLeod Mine in the Matagami Camp in Central Québec
9 juillet 2010: Xstrata Zinc Annonce La Construction De La Mine Bracemac-McLeod Située Dans le Camp Minier de Matagami, Au Centre du Québec
July 9, 2010: Xstrata's Press Room: Xstrata Zinc commences construction of Bracemac-McLeod Mine
June 3,2010: Feasibility study on Bracemac-McLeod Nearing Completion
Juin 3,2010: L'Étude De faisabilité du gisement Bracemac-McLeod Tire à Sa Fin
April 13, 2010: Definition Drill Program Completed at Bracemac-McLeod
13 avril, 2010: Le Programme de Forage de Délimitation est Terminé à Bracemac-McLeod
March 7, 2010: Bracemac-McLeod Update
7 mars, 2010: Mise à jour des résultats de forage sur le gisement Bracemac-McLeod
February 16, 2010: McLeod Deep Discovery Expanded - 7.50 metres grading 10.27% Zinc, 3.44% Copper, 50.71 GPT Silver and 1.12 GPT Gold Intersected Down-Dip of the McLeod Zone
16 fevrier, 2010: 7,50 mètres à 10,27% zinc, 3,44% cuivre, 50,71 gpt argent et 1,12 gpt or dans la nouvelle zone McLeod en profondeur
February 15, 2010: Additional Private Placement Closings
February 2, 2010: Financing Closed
January 29, 2010: Financing Increased
January 19, 2010: $5,014,375 Financing
January 13, 2010: 21.60 Metres Grading 6.05% Zinc, 1.85% Copper, 65.5g/t Silver, 1.56g/t Gold, Discovered 411 Metres Down-Dip of the McLeod Zone
14 janvier, 2010: Decouverte de Sulfures Massifs À Plus de 400 Mètres de la Zone McLeod: 21,60 Mètres Titrant 6,05% Zinc, 1,85% Cuivre, 65,5g/t Argent et 1,56g/t Or







